District Lebong
condition that has many rivers is the electric potential energy
is a simple concept Pico Power economically far more efficient
compared with the model micro-hydro plants, the basic
consideration is based on |
-
Quite a lot of
potential as a river tributary that connects to the river air
ketahun
-
Conditions of the
population and are scattered along the river and creek.
-
More easily combined
with the Electrical hybrid system, such as Pico Power Power Power
Power solar cell.
Pico hydro technology
can be used for the limited energy, such as the lighting and
electronic equipment needs a small wall. Can bring the energy needs
of small-scale electricity in some villages Electrical Lighting
System on Conservation Carbon program Lebong already running |
 |
|
|
 |
The form of a model
system electricity package that will be developed in a
district that has a system electrical independently.
n addition, the
development of programs that already have a model Solar Cell
Energy
Power
, which currently is
used in some point in the region Lebong districts, like in some
districts now have been installed and lighting facilities
elektrisasi housing by using the solar cell systems and
LED lighting Systems, the quantity has been around 200 units of
solar Cell but the actual needs require more than
3000 solar cell for one district solar cell
in one Sub District,
Through the study
team Lebong Conservation Activities of the system electrical
for lighting conclude that the type of lamp type LED more
appropriate program installed on the lighting plan. This type of
lighting is also environmentally friendly than have other
advantages such as life time more than 50,000 hours, very low
power installed just a house attached to 14 watts |
|
|
|
 |
Minimum
of 5 point can be very bright. in addition
to the type of home lighting will we also plan to replace the
lamp LED type of lamp that is connected with the conventional solar
cell, at some point in the District Lebong district.
Sub District
Pinang Belapis the
district is one result of the expansion on the Conservation Area
Plan Model will be built center Hybrid Power System combination
the two types of power source that is different and Power Plant
Picohidro Solar Cell
Systems that will be enabled as a charging station, as the center of
energy in electricity Sub District Pinang Belapis, the
expected target independent electrical and in the field
of light, also serve as an example to other district
District efforts to
Lebong can put some of his village to be independent of the Electric
Energy will soon be implemented through several programs Electrical
system of independent power for some villages that have not yet
reached by electricity grid network.
Target will be
implemented gradually and continuously in accordance with the
program electrical
|
| |
|
|
|